U.S.-Pakistan Center for Advanced Studies in Water of Mehran University organizes Consultative Workshop Jamshoro Consultative Workshop on Hydro-Agro Informatics (HAI)…
Read More »Irrigation
The width of each new gate is 60ft and height is 23ft which can maintain maximum pond level of 200.5ft.…
Read More »Project Director, SBIP Ghulam Muhiudin Mughal and Mr. Lyu Ming, authorized representative of the Company signed the agreement. By Rehan…
Read More »Sukkur Barrage and right bank canals face the issue of excessive sediment ingress and the reduced flood-carrying capacity. By Rehan…
Read More »Since the advent of solar system, farmers have been using groundwater indiscriminately; experts at a seminar on World Water Day…
Read More »Dr. Charles visited Kotri barrage in connection with training of Irrigation Department’s engineers and introducing the canal modernization in irrigation…
Read More »Work on 32 water channels has stopped by PTI govt. due to non-availability of funds while 21 other schemes of…
Read More »Feasibility study component is a part of the World Bank sponsored Sindh Barrage Improvement Project. Karachi: Sindh Chief Minister Syed…
Read More »Secretary Irrigation apprises IRSA Chairman of objections and reservations raised by Sindh in Advisory Committee held on Sept.30 Karachi: Sindh…
Read More »Minister warns of serious protests across Sindh if the required supply of water in Indus River was not ensured immediately.…
Read More »